Beginning with the design concept thru project completion, a Tailored Buildings management team carefully controls each phase of the construction process - with a complete staff of skilled tradesmen, and a hands-on management approach that enhances commun
Pre-Engineered building with 5,000 sf of office space and 10,000 sf of warehouse/distribution space.
Pre-Engineered building with 5,000 sf of office space and 10,000 sf of warehouse/distribution space.
Pre-Engineered building with 5,000 sf of office space and 10,000 sf of warehouse/distribution space.
Project: Champion Bus
We erected this metal building for DDC Construction at the Champion Bus Manufacturing Plant in Imlay City. The building was erected in two phases, allowing them to move into the first phase and continue operation during construction of the second phase.
Project: La Cantina
Renovations included Hardiplank siding, architectural stone, stained concrete walkways, and mechanical penthouse on the roof. A new game room was added to the back of the existing restaurant.
Project: Apple Quest Farms
Pioneer Construction erected the building and trimmed the Interior. It has in-floor heating with a wood boiler outside. We also put up 4 spray buildings and a 9,600 sq ft apple storage controlled atmosphere room.
Project: Jack Brown Produce
Provided labor on controlled atmosphere apple storage facility.
140'x207'x25'
Pre-Engineered building with 5,000 sf of office space and 10,000 sf of warehouse space.
Project: Kentwood Packaging Corporation
Project: Alderman Freeman Lock-N-Store
Project: Chrysler Superstore of Greenville
Pioneer Construction erected the building and trimmed the Interior. It has in-floor heating with a wood boiler outside. We also put up 4 spray buildings and a 9,600 sq...
Design-Builder
Provided labor on controlled atmosphere apple storage facility.140'x207'x25'
Framing